flood level

美 [flʌd ˈlevl]英 [flʌd ˈlevl]
  • 洪水位;洪水位,溢流水位
flood levelflood level
  1. Application of Hydraulics Method to Ascertain Design Flood Level in Inundate Area

    应用水力学方法推求内涝区设计洪水位

  2. A Method to Compute Design Flood Level of Power Plant on Warping River Convex Side

    在弯曲河道凸岸处推求厂址设计洪水位的方法探讨

  3. Dynamic management of flood level at large and medium-sized reservoirs

    浅谈大中型水库汛限水位的动态管理

  4. Classification of flood level and its meaning in disaster reduction

    洪水的等级划分及其减灾意义

  5. Numerical simulation of influence of riverside constructed wetland on river flood level

    河滩人工湿地对河流洪水位影响的数值模拟

  6. Analysis of Flood Level for Dikes Heightening Design Based on Measured Annual Maximum

    基于实测年最高洪水位的现有堤防加高设计的洪水位分析

  7. The water nearly rose to flood level .

    水快涨到泛滥点了。

  8. Dynamic control of reservoir limited flood level on the basis of flood control reservoir capacity compensation regulation

    基于库群防洪库容补偿调度的水库汛限水位动态控制

  9. Correlation analysis on abnormal change of flood level in the central area of the Pearl River Delta

    珠江三角洲腹地洪水特征变异因素的关联分析

  10. Carried on the stress state analysis of the earth dam under the condition of checking flood level .

    利用理正工程软件对土坝进行了校核洪水位工况下的渗流和稳定分析,将两者的计算结果进行对比。

  11. On the calculating method of design flood level of the dikes along the lower Huanghe River

    黄河下游堤防工程设计防洪水位计算方法探讨现代工程水力学

  12. Analysis of the influence of Dongting Lake 's area variation measured by MODIS on flood level

    基于MODIS的洞庭湖面积变化对洪水位的影响

  13. The flood level in Dongting Lake is raised over 1m .

    湖区洪水位抬高10m以上。

  14. Way for Reducing Maximum Flood Level of River Course for Flood Discharge in Rehabilitation of Urban River Surge

    城市河涌整治中降低泄洪河道最高洪水位的途径

  15. Some evaluations for storm surge in determination of design basis flood level on coastal nuclear power plant site

    在滨海核电厂设计基准洪水位确定中的风暴潮评价

  16. Flood Level Effect of Polder in Poyang Lake

    鄱阳湖围垦的洪水位效应

  17. Study of the flood level characteristics of the typical hydrologic stations in the middle reaches of the Yangtze River

    长江中游典型测站1998年洪水位变化特性

  18. Characteristic of the flood level in the Qiantang Estuary and mobile-bed model for forecast

    钱塘江河口洪水特性及动床数值预报模型

  19. We talk about how to reduce effectively the flood level of the river courses for flood discharge in urban flood control .

    流经城区的泄洪河道往往在雨季造成水渍,产生不同程度的财产损失。

  20. The designed discharge and designed flood level are determined by hydrological computation and main characteristic value of highway bridge is checked .

    通过桥渡水文计算,确定了设防流量及设防水位,校核了大桥主要特征值;

  21. She decided to expand and raise her home , made of bamboo and tin , above the usual flood level .

    她决定把家建得高一些,大一些。她用竹子和钖,把房子建在高于氾滥水平的地方。

  22. By using this method the seepage risk rate of embankment under the condition of high flood level never occurred in history can be predicted .

    本文提出的模型可预测未曾发生过的高洪水位工况下的堤防渗流风险率。

  23. But when flood level is rising gradually , controlling the flood level 's rising is also very important to prevent dike piping .

    由于洪水位还有不断上升的发展趋势,防治管涌还应注意控制洪水位上升的问题。

  24. Based on the flood level frequency curve , hydrological failure risk was divided into flood overflowing risk and flood overtopping risk .

    基于推求的洪水位频率曲线,将堤防水文失事风险分为洪水漫溢风险和洪水漫顶风险。

  25. Illinois River crested Tuesday in Peoria at a record high flood level of just under 30 feet .

    周二,皮奥里亚伊利诺伊河的水位达到了历史最高值,仅略低于30英尺。

  26. The flood level as high as9 meters gravely endangers the safety of citizens living in the flooded areas .

    水位高达9米的洪水对灾区居民人身安全构成严重威胁。

  27. Moreover , this paper analyzes the difficult point and the direction of improvement to realize the accuracy forecasting of the flood level of erodible-bed channel .

    另外分析了要实现变动河床洪水位过程准确预报的困难所在及改进方向。

  28. If the flood level reaches a level higher than the bottom edge of the car door , the flood water may get into the car engine compartment .

    如果洪水水平达到一个水平高于底部的边缘,车门,洪水水可能进入汽车发动机舱。

  29. According to the pattern of the mathematical structure of earthquake magnitude and wind-speed degree , the author attempts to establish a classified formula for the flood level .

    根据地震,风力等级的数学结构,提出一种洪水等级划分公式;

  30. Flood level index system is established and flood is divided into greater than 10 years and less than 10 years . ( 2 ) Flood characteristics trend analysis and climate factors impact analysis .

    建立洪水量级的指标体系,将洪水按频率分别为大于10年一遇和小于10年一遇。(2)洪水特征量变化趋势分析以及气候因素影响分析。